Whole
House Sponsorship Cost Breakdown
|
Item
|
Cost
|
Donor(s)
Name(s)
|
Donation Amount
|
|
1.
Land
and Infrastructure
|
$18,000.00
|
|
|
|
|
|
|
|
|
2.
Lot
Clearing
|
$500.00
|
|
|
|
|
|
|
|
|
3. Soil Treatment
|
$300.00
|
|
|
|
|
|
|
|
|
4. Sewer
|
$530.00
|
|
|
|
|
|
|
|
|
5. Tap Fees-CPW
|
$400.00
|
|
|
|
|
|
|
|
|
6. Water Meter
|
$500.00
|
|
|
|
|
|
|
|
|
7. Footer Concrete
|
$550.00
|
|
|
|
|
|
|
|
|
8. Concrete Block/Labor
|
$3,400.00
|
|
|
|
|
|
|
|
|
9. Rebar
|
$200.00
|
|
|
|
|
|
|
|
|
10. Slab Materials
|
$60.00
|
|
|
|
|
|
|
|
|
11. Framing Materials
|
$3,900.00
|
|
|
|
|
|
|
|
|
12. Trusses
|
$1,600.00
|
|
|
|
|
|
|
|
|
13. Roofing Material
|
$2,400.00
|
|
|
|
|
|
|
|
|
14. Siding Materials
|
$1,800.00
|
|
|
|
|
|
|
|
|
15. Exterior Doors
|
$390.00
|
|
|
|
|
|
|
|
|
16. Windows
|
$1,500.00
|
|
|
|
|
|
|
|
|
17. Plumbing Parts/Labor
|
$4,000.00
|
|
|
|
|
|
|
|
|
18. Rough Electrical Parts
|
$900.00
|
|
|
|
|
|
|
|
|
19. Sheet Rock/Labor
|
$1,100.00
|
|
|
|
|
|
|
|
|
20. Wall Insulation
|
$400.00
|
|
|
|
|
|
|
|
|
21. Ceiling Insulation
|
$550.00
|
|
|
|
|
|
|
|
|
22. Cabinets
|
$2,000.00
|
|
|
|
|
|
|
|
|
23. Countertops
|
$280.00
|
|
|
|
|
|
|
|
|
24. Paint
|
$430.00
|
|
|
|
|
|
|
|
|
25. Trim Parts and Doors
|
$1,400.00
|
|
|
|
|
|
|
|
|
26. Interior Hardware
|
$380.00
|
|
|
|
|
|
|
|
|
27. Carpet & Viynl/Labor
|
$1,500.00
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
28. Appliances
|
$650.00
|
|
|
|
|
|
|
|
|
29. Rough HVAC Parts/Labor
|
$2,400.00
|
|
| |